Congratulations and thank you for purchasing a Rubbermaid storage building.BEFORE YOU BEGIN – BUILDING CODESBe sure to check your local building codes
Install Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). Position connectors in slots and slide down to snap in plac
Snap middle position Repeat Left Side (C) into the middle position Repeat Floor (B).c.21clickAlign the lap joint between back position Repeat Left Sid
Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.Note: This pilot hole is to be drilled thro
Snap Front Left Side (G) into Front Floor (A).d.21clickALIGNALIGNG3.6 Wall Panel E (Repeat Right Side) InstallationInstall Wall Connector (Q) 5 place
Align the lap joint between Repeat Right Side (E) andmiddle position Repeat Right Side (E).b.EOVERHEAD VIEWDETAIL 3-1_BSCALE 1/1DETAIL 3-3_ESCALE
3.7 Wall Panel H InstallationAlign the lap joint between Front Right Side (H) andmiddle position Repeat Right Side (E).c.HHHScrew HolesUsing a screwd
Snap Front Right Side (H) into Front Floor (A).d.Install Wall Connector (Q) 5 places, connecting middlesection Repeat Right Side (E) and Front Right S
Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown.Lower the roof onto the walls and align
4.1 Roof Panel M (middle position) InstallationMRBInstall one Repeat Roof (M) onto middle section. The overlap edge of roof points toward the back of
From inside the shed, install four Screws (AA) into the roof at each side wall location. Note: The screws also have to go through the Roof Brace (RB)
Description Part Number Assembly Letter Quantity Required Tools Two Person AssemblyFloor Front Floor 5L01A1 Repeat Floor 5L11B2Walls Repea
4.2 Roof Panel J (front position) & Door InstallationInstall one Front Roof (J) onto front section: roof gable edge toward front of shed.Align to
From inside the shed, install four Screws (AA) into the roof at each side wall location. Note: The screws also have to go through the Roof Brace (RB)
5.0 Finishing InstallationInstall Screws (AA) into 10 locations shown at bottom of wall panels to secure walls to floor. a.AA (10)HELPFUL HINT: Pilo
5.1 Door Finishing InstallationInstall Lock Hasp (X) into opening on Right Door (K).a.Install Door Handle (T) onto Left Door (L) using fourScrews (AA
Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before b
ABB2.0 Floor InstallationAUsing a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).c.Drill pilot hol
AB2.1 Floor InstallationConnect and align back position Repeat Floor (B) to middle position Repeat Floor (B) and install Screws (AA) 9 places; keep p
3.0 Wall Panel C InstallationUsing a screwdriver, punch out the screw holes on the top of Repeat Left Side (C) 2 places.a.CSnap Repeat Left Side (C)
OVERHEAD VIEWDETAIL 3-1_BSCALE 1/1DETAIL 3-3_ESCALE 1/1DETAIL 3-3_BSCALE 1/1DETAIL 3-4_B AND 3-5_BSCALE 1/1DETAIL 3-6_B AND 3-7_BSCALE
3.2 Wall Panel E InstallationSnap Repeat Right Side (E) into the back position ofRepeat Floor (B).b.Hold Repeat Right Side (E) upright to prevent it
3.3 Wall Panel F InstallationConnect Right Back (F) onto dovetails of Repeat RightSide (E). Align the lap joint between Left Back (D) and Right Back
Comentários a estes Manuais